Underground Delays

Day of Week - Tue - Records

Index   Chart   First   Previous   Next   Last   Links

  Line   Date   Time   Delay   Acc Delay   Station   Cause   Area   Equip   H/E 
 #1   Central   5-Mar-96   0705   10   West Ruislip   train defect   train 
 #2   Central   5-Mar-96   1349   7   Wood Lane   staff error in using telephone tunnel equipment   signal   telephone   yes 
 #3   Central   12-Mar-96   0516   4   7   Marble Arch   signal problems   signal 
 #4   Central   12-Mar-96   0536   16   Stratford   signals stuck at danger   signal 
 #5   Central   12-Mar-96   0604   5   Newbury Park   train/track defect   train track 
 #6   Central   12-Mar-96   1150   35   50   fault trips emergency brakes on train   train   brake 
 #7   Central   19-Mar-96   1115   27   40   West Ruislip   signal failure   signal 
 #8   Central   19-Mar-96   1526   6   15   East Acton   signal failure   signal 
 #9   Central   19-Mar-96   1622   10   30   East Acton   same signal fails again   signal 
 #10   Central   26-Mar-96   0631   10   White City   brake failure   train   brake 
 #11   Central   26-Mar-96   0635   30   Woodford   brake failure   train   brake 
 #12   Central   26-Mar-96   0954   7   10   South Woodford   defective brakes   train   brake 
 #13   Northern   5-Mar-96   1404   98   Kings Cross   defective LEB power supply   power 
 #14   Northern   12-Mar-96   1103   13   Golders Green   signal problem   signal 
 #15   Northern   12-Mar-96   1120   13   Golders Green   signal problem   signal 
 #16   Bakerloo   5-Mar-96   0623   7   Elephant & Castle   due to train fault   train 
 #17   Bakerloo   12-Mar-96   0818   6   Queens Park   overrun of Railtrack engineering works   night 
 #18   Bakerloo   12-Mar-96   1140   10   Queens Park   train shunting causes congestion   operation 
 #19   Bakerloo   12-Mar-96   1557   10   17   train door problems   train   door 
 #20   Bakerloo   12-Mar-96   2219   6   Queens Park   driver fails to arrive   driver   yes 
 #21   Bakerloo   12-Mar-96   0008   17   Queens Park   problems with track points   track 
 #22   Bakerloo   12-Mar-96   0030   25   35   late running night engineering workers train   operation 
 #23   Bakerloo   19-Mar-96   0648   6   10   Queens Park   train delayed on shared North London track   operation 
 #24   Bakerloo   19-Mar-96   2038   8   Elephant & Castle   train driver cuts finger   driver   yes 
 #25   Bakerloo   26-Mar-96   1406   12   20   Harrow & Wealdstone   train power supply problems   train power 
 #26   Bakerloo   26-Mar-96   1659   10   Queens Park   problems on shared track with main line tracks   operation 
 #27   Bakerloo   26-Mar-96   2028   9   15   Queens Park   track problems on main line   operation 
 #28   Jubilee   5-Mar-96   0900   9   Wembley Park   defective train motors   train   motor 
 #29   Jubilee   5-Mar-96   1013   6   Willesden Green   defective train motors   train   motor 
 #30   Jubilee   12-Mar-96   0025   2   4   train overruns signal at danger   driver   yes 
 #31   District   5-Mar-96   0951   5   High St Kensington   train armrest broken   train 
 #32   District   5-Mar-96   0932   12   Wimbledon   defective doors   train   door 
 #33   District   5-Mar-96   0646   5   Acton Town   defective train   train 
 #34   District   5-Mar-96   1317   11   Earl's Court   driver late   driver   yes 
 #35   District   5-Mar-96   0839   7   Aldgate East   track power failure   track power 
 #36   District   12-Mar-96   0856   49   Turnham Green   signal failure   signal 
 #37   Metropolitan   5-Mar-96   1904   12   53   signal failure   signal 
 #38   Metropolitan   12-Mar-96   2359   19   24   Edgware Road   following defective train elsewhere on system   operation 
 #39   Metropolitan   19-Mar-96   0541   154   Croxley   multiple signal failure caused by overnight theft of cables   theft signal 
 #40   Metropolitan   26-Mar-96   0652   23   32   Rayners Lane   signalman's error   signal   yes 
 #41   Victoria   5-Mar-96   1406   96   Kings Cross   defective lighting   safety station   lighting 
 #42   Victoria   26-Mar-96   1447   37   Blackhorse Road   train power problem   train power 
 #43   Piccadilly   5-Mar-96   0854   10   20   Hillingdon   defective train doors   train   door 
 #44   Piccadilly   5-Mar-96   0853   6   30   South Harrow   signal failure   signal 
 #45   Piccadilly   12-Mar-96   1645   5   Northfields   train broken lights   train   lighting 
 #46   Piccadilly   12-Mar-96   1647   5   15   Fisnbury Park   train broken lights   train   lighting 
 #47   Piccadilly   26-Mar-96   0705   13   26   South Harrow   points failure and stalled train   track train 
 #48   Piccadilly   26-Mar-96   0958   15   25   Wood Green   computer control failure   signal   computer